Peugeot 406

since 1996 release

Repair and operation of the car



Peugeot 406
+ 1. Maintenance instruction
+ 2. Maintenance
+ 3. Engine
+ 4. Cooling systems, heating and ventilation
- 5. Fuel system
   + 5.1. Power supply system of petrol engines
   - 5.2. Fuel system of diesel engines
      5.2.1. Technical data
      5.2.2. Filling and pumping of fuel system
      5.2.3. Air filter and air inlet channels
      5.2.4. Accelerator cable
      5.2.5. Accelerator pedal
      5.2.6. Adjustment of the fuel pump of high pressure
      5.2.7. Electromagnetic valve of a stop of the engine
      5.2.8. Fuel pump of high pressure Bosch
      5.2.9. Fuel pump of high pressure Lucas
      5.2.10. Installation of the moment of injection
      5.2.11. Installation of the moment of injection on TNVD Bosch
      5.2.12. Installation of the moment of injection on TNVD Lucas
      5.2.13. Fuel nozzles
      5.2.14. Sensors and executive mechanisms of the Bosch AS3 system
      5.2.15. Sensors and executive mechanisms (Lucas EPIC)
      5.2.16. Inlet collector
      5.2.17. Final collector
      5.2.18. Turbocharger
      5.2.19. Removal and installation of a turbocharger
      5.2.20. Check of a turbocharger
      5.2.21. Intermediate cooler
+ 6. System of ignition
+ 7. Coupling
+ 8. Transmissions
+ 9. Power shafts
+ 10. Brake system
+ 11. Suspension bracket and steering
+ 12. Body
+ 13. Electric equipment
+ 14. Main malfunctions





5.2.16. Inlet collector

GENERAL INFORMATION

1.9 LITRES ENGINES


Prevention

Inlet and final collectors are established on the same laying. Therefore it is recommended to remove at the same time both collectors that it was possible to replace laying.


Removal

PERFORMANCE ORDER
1. Disconnect the negative plug of the accumulator.
2. Remove the system of pipes of an air inlet from the top part of the engine attached to an inlet collector.
3. Remove a vacuum hose, then unscrew two bolts of fastening of a diaphragm of management to a collector. Move assembly of a diaphragm aside.
4. Lift a forward part of the car and record on supports. Remove a mudguard from under the engine.
5. If the system of inlet pipes was not removed, disconnect an entrance opening from a turbocharger exit. Close a turbocharger opening a pure rag.
6. Unscrew two bolts fixing the EGR valve to the top part of a final collector.
7. Unscrew bolts of fastening of an inlet collector. Weaken, but do not unscrew completely central bolt of fastening of a collector which is located in a collector groove.
8. Remove a collector from a head of the block of cylinders.

Installation

PERFORMANCE ORDER
1. Installation is made in the sequence, the return to removal.
2. It is necessary to consider the next moments:
     – replace laying;
     – tighten all bolts the required moment;
     – replace laying at installation to the place of the EGR valve;
     – check that all hoses and pipes are correctly established and reliably fixed.

2.1 LITRES ENGINES

Removal of the top part
Prevention

Between a final collector and a partition of a motor compartment there is not enough place for removal of the lower part of a collector on the engine installed on the car.


PERFORMANCE ORDER
1. Weaken a collar (it is specified by an arrow) and remove a pipe from the top part of a collector.
2. Remove a screw clip of fastening of a flexible part of an EGR pipe to a collector.
3. Unscrew four bolts (are specified by shooters) fastenings.
4. Lift the top part of a collector.
5. Remove four consolidations connecting pipes from the lower part of a collector.

Installation

PERFORMANCE ORDER
1. Installation is made in the sequence, the return to removal.
2. Replace four rubber consolidations connecting pipes.
3. Screw up all bolts the required moment.

4. Fix an EGR pipe with a new screw clip (it is specified by an arrow).

Removal of the lower part

PERFORMANCE ORDER
1. Remove the power unit (the engine together with the transmission).
2. Remove the top part of a collector.
3. Unscrew fastening bolts (are specified by shooters) a collector, noting the provision of a suspension bracket of support of a pipe on the right side of a collector.
4. Remove a collector from a head of the block of cylinders, having unscrewed an EGR pipe.
5. Remove laying of a collector.

Installation

PERFORMANCE ORDER
1. Installation is made in the sequence, the return to removal.
2. Consider the next moments:
     – replace laying of a collector;
     – tighten bolts the required moment;
     – establish the top part of a collector;
     – install the power unit.